Skip to content
UpsideADU

Cameron Park, CA · El Dorado County

Detached ADU in Cameron Park

Upside ADU builds detached adus in Cameron Park, El Dorado County, for a $1,000 deposit with transparent fixed pricing and inspection-tied payments. A typical Cameron Park detached adu runs $132,500$457,920 all-in, and we permit it through the El Dorado County Planning & Building Department end to end.

Typical Cameron Park detached adu cost (2026)
$132,500$457,920
$265$382/sq ft · turnkey, all-in
Detached ADU built by Upside ADU in Cameron Park, CA

Cameron Park rules that affect a detached adu

Cameron Park's mix of lots leaves room for a standalone backyard unit with its own entrance, kitchen, and bath — the highest-value, most-rentable ADU type. The El Dorado County Planning & Building Department reviews detached builds on the standard 60-day clock.

Local permitting: Cameron Park permits through the El Dorado County Planning & Building Department. Larger lots comfortably fit a full detached ADU; many parcels are on septic, and the Cameron Park Airport overlay can affect a small subset of properties, which we verify during feasibility.

That's the detached adu-specific picture. For the full El Dorado County rulebook — every setback, height, and owner-occupancy detail — see our Sacramento-region ADU rules guide, and learn how the build type works statewide on our detached adu page.

Why Cameron Park homeowners pick Upside

  • $1,000 deposit — the CA legal max
  • Inspection-tied milestone payments
  • We know the El Dorado County Planning & Building Department process
  • Transparent, all-in Cameron Park pricing
  • Property-manager referral when you rent

Cameron Park detached adu cost snapshot

A fully independent dwelling in your backyard with its own entrance, kitchen, and bath. Detached ADUs add the most property value and command the highest rents of any ADU type. In the El Dorado County market that prices out to about $265$382 per square foot, or $132,500$457,920 for a finished, permitted unit. A typical Cameron Park detached adu rents for $1,600$2,500 a month.

SizeTypical useCameron Park all-in cost (2026)
500 sq ftStudio / 1-bed, max cash-on-cash$132,500$190,800
850 sq ft1–2 bed, most popular$225,250$324,360
1200 sq ft2–3 bed / multigen, max value$318,000$457,920

Dial in your own number with the ADU cost calculator.

Estimate your ADU

Ballpark 2026 turnkey cost, financing, and rental return for your area.

850 sq ft
500 sq ft1200 sq ft

Estimated turnkey cost

$225,250$324,360

$265$382 / sq ft · incl. design, permits & construction

Est. financed payment
$1,575$2,268/mo
Est. monthly rent
$2,325$2,925/mo
Estimated payback~8.7 years
Get my exact quote

Estimates only — 2026 regional ranges, not a bid. Your real price depends on site conditions, finishes, and your lot. We confirm with a free feasibility check.

Detached ADU projects in Cameron Park

Cameron Park is a value alternative to El Dorado Hills next door — Cameron Estates and central lots are big and flat enough for a straightforward full-size build. Septic and the airport overlay get checked on the handful of parcels each one touches. Every detached adu is fixed-price, funded on inspection-passed milestones, and backed by our written guarantee.

Browse finished builds and specs in our ADU project gallery.

Detached ADU in Cameron Park — FAQs

A detached adu in Cameron Park typically runs $132,500–$457,920 turnkey in 2026, based on $265–$382 per square foot for the El Dorado County market. We confirm your exact number with a free feasibility check.

Cameron Park detached adu permits are handled by the El Dorado County Planning & Building Department. Cameron Park permits through the El Dorado County Planning & Building Department. Larger lots comfortably fit a full detached ADU; many parcels are on septic, and the Cameron Park Airport overlay can affect a small subset of properties, which we verify during feasibility. We prepare and submit the full package and manage inspections.

A detached adu in Cameron Park rents for about $1,600–$2,500 a month in 2026 depending on size and finish. Commuter demand toward Folsom and Sacramento keeps Cameron Park rentals steady, giving income-focused owners reliable cash flow at a lower entry price than El Dorado Hills.

A detached ADU in the Sacramento region typically runs $165,000–$500,000 in 2026, or roughly $250–$360 per square foot turnkey (design, permits, and construction included). A 750 sq ft 2-bed/1-bath lands around $230,000–$300,000 at mid-range finishes.

State law allows detached ADUs up to 1,200 sq ft. Units under 750 sq ft are exempt from impact fees, which is why many Sacramento homeowners build right at that threshold for the best cost-per-rental-dollar.

Plan on about 6–9 months end to end: 2–6 weeks design, 4–10 weeks permitting (as fast as 30 days with pre-approved plans), and 12–16 weeks construction.

Detached ADU near Cameron Park

ADU services in Cameron Park

Upside models for Detached ADU

More for Cameron Park

Not sure which type fits your lot? See all ADU services in Cameron Park or compare every build type on our ADU services hub.

Build your detached adu in Cameron Park

Get a transparent Cameron Park quote and a free feasibility check for your lot.

CallFree Estimate